News

air source heat pump heating system installation

  • By:
  • Date:2025/06/25

Below is a structured English technical guide on air source heat pump heating system installation,Key installation specifications, precautions, and maintenance steps are covered for professional reference.

🔧 I. Host Unit Installation Location

  1. Ventilation & Sun Exposure
    • Install in well-ventilated areas (balcony, roof, ground), ensuring ≥1m clearance for air intake and ≥2m for exhaust outlets. Avoid obstructions to airflow .
    • Prioritize sunny locations to enhance thermal efficiency and reduce energy consumption .
  2. Load-Bearing & Stability
    • The base must withstand 2–3 times the unit’s weight. Use a 15–20cm concrete base for ground installation; wall-mounted units require expansion bolts .
    • Install horizontally with rubber shock pads to minimize operational resonance .
  3. Weather & Drainage Protection
    • Top-exhaust units need snow hoods to prevent fan blockage .
    • Defrost drainage pipes must slope toward sewers to avoid ice accumulation and equipment damage .

⚙️ II. Hydraulic System Standards

  1. Water Pump Installation
    • Orientation: Mount horizontally to prevent bearing wear or motor burnout .
    • Position: Install on the return-water side (not outlet) to ensure sufficient flow and prevent overheating alarms .
    • Flow Optimization: Minimize elbows to reduce resistance and maintain pump head .
  2. Freeze Protection & Exhaust
    • Insulate all outdoor pipes with rubber foam + aluminum tape .
    • Install automatic air vents at the system’s highest point to prevent airlocks .
    • Drain water during prolonged inactivity to avoid pipe freezing .

🔌 III. Electrical & Control Systems

  1. Wiring Safety
    • Position the pump junction box upward to prevent condensation damage .
    • Ensure voltage matches unit ratings and install leakage protectors .
  2. Temperature Settings
    • Gradually increase initial water temperature (≤40°C) to prevent system shock .
    • Coordinate thermostat settings with host parameters to minimize frequent starts/stops .

🛠️ IV. Commissioning & Maintenance

  1. Pre-Debugging Checks
    • Verify leak-free pipes, secure wiring, and proper end-unit connections .
    • Test compressor delay protection (3-min startup), abnormal noise, and condensate drainage .
  2. Long-Term Maintenance
    • Clean hydraulic filters and evaporator fins annually .
    • Set to low-temperature mode during short absences; drain and power off for extended disuse 

INQUIRY

CONTACT US

contact-email
contact-logo

AIRCAL HEAT PUMP CO., LTD.

We are always providing our customers with reliable products and considerate services.

If you would like to keep touch with us directly, please go to contact us

  • Home

    Home

  • Tel

    Tel

  • Email

    Email

  • Contact

    Contact